Air Cooled Scroll Type Water Chiller

1.Software of scroll industrial air cooling water chiller
In air conditioning systems, chilled h2o is normally distributed to warmth exchangers, or coils, in air handlers or other varieties of terminal devices which great the air in their respective space(s). The water is then recirculated to the chiller to be recooled. These cooling coils transfer sensible heat and latent heat from the air to the chilled water, hence cooling and usually dehumidifying the air stream.

2.Eurostars CZPT Air CZPT Scroll Drinking water Chillers Functions:
(1)Higher Effectiveness Scroll Sort CZPT
—Flexible large-efficiency scroll compressor, which patent versatile design gives greatest potential of fluid-attack resistance and impurity tolerance.
—Continuous compression output make certain the pulse of air movement to be diminished, with reduced vibration sounds
(two)Large Performance Air Aspect Warmth Exchanger
—Special shaped style, internal grooved patent sawtooth layout and aluminum fin guarantee productive heat exchange amongst the air facet exchanger and ambient air.
(3)Large Performance H2o Aspect Warmth Exchanger
—Tube in shell tank sort: Improve style of both inner and outer screwed tube, it will help to increase heating trade efficiency, and provide greater heating potential. The particular layout of liquid refrigerant circulating tube on the bottom of condenser guarantees the heat pump technique operate efficiently in serious working problem.
—Brazed-plate evaporator manufactured from stainless steel features a model-new diagonal layout to far better utilize warmth exchanging surfaces.
—Shell and tube evaporator with internal grooved cooper tubes optimizes the cooling and heating effectiveness.
Self-cleansing,higher depth,anti-shaking design and style and heat insulation masking material make certain shell and tube warmth exchanger unstained,reputable,tranquil,extremely effective.
(4)Throttling Device
Adopt outstanding good quality CZPT exterior balanced thermal enlargement valve or capillary variety throttling device, which is higher trustworthiness and adjustability, can understand exact refrigerant and temperature manage to ensure working in precise and trustworthy status.
(five)Axial admirer
Undertake CZPT model axial enthusiast,compact composition,which is accord with aerodynamic ideas falciform impeller which can assure it operates with large effectiveness and lower noise,also can maintain a better aerodynamic efficiency even under a short air inlet situation.
(6)Intellectualized Controller
Undertake micro laptop handle, can function via centralized control method total method can recognize distant operation. The program can monitor the water temperature, capacity position although managing. The drinking water temperature can be managed in accordance to the drinking water outlet temperature.

three.Air Cooled Scroll CZPT H2o Chiller CZPT Datas

Air Cooled Chiller Unit(commerical sort)
Model      ESSA- 05STN 10DTN 12DTN 20QTN 25QTN 20DTN 25DTN
Rated CZPT Ability KW fourteen 28 34.five fifty eight.2 66 58 sixty seven
USRT 4. 8. nine.8 sixteen.6 18.8 sixteen.5 19.1
×1000 kcal/h 12. 24.1 29.7 fifty.1 56.8 forty nine.9 57.six
Refrigerant R407C
Evaporator Tank Tube in Shell  Shell and Tube
Condenser Ripple Aluminum Fins close to Cooper Pipe
                   
Model      ESSA- 25DTP 40QTN 50QTP 80DTP 100QTP 160QTP
Rated CZPT Potential KW sixty six 106 a hundred thirty 230 290 460
USRT 18.8 30.one 37. sixty five.4 eighty two.five a hundred thirty.eight
×1000 kcal/h fifty six.eight 91.two 111.eight 197.eight 249.4 395.6
Refrigerant R410A R407C R410A
Evaporator Shell and Tube 
Condenser Ripple Aluminum Fins all around Cooper Pipe

four.Air Cooled Scroll Water Chiller Major Elements Introduction
1) Foundation frame and exterior panels are manufactured of galvanized sheet.
two) Higher effectiveness compressor with R407C/R410A/R134A Refrigerant.
3) Touch design Liquid crystal display control panel, and the control indicators are easier to be transferred to the handle method
four) Openable cabinet doorway style for faster and less difficult checking and maintenance
five) Exterior rotor supporter guarantees reduce sounds and vibration
six) Pretty outlook and sharp edges reduction cabinet design
7) Higher high quality copper tube coils built of thread technological innovation
8) CZPT testing and operational take a look at carried out for each and every unit ahead of package deal in the factory.
9) With complete defense features which includes drinking water flow, higher/minimal force, period buy, above-current and so on.

5. EUROSTARS CZPT Air Coooling Scroll H2o Chiller Series

6.About US
We, EUROSTARS, which proven in calendar year 2006, is a contemporary hi-tech enterprise, specializing in Heating Ventilation Air Conditioning and CZPT CZPT study, improvement, production, sales and engineering companies which be constantly here to supply pursuing services:
one) Task technique style
2) CZPT assistance
three) CZPT creation
four) Supply
5) Set up
six) Examination and commissioning
7) Mend and maintenance
8) Right after sale support, and so forth

seven.FAQ
Q: What sort of CZPT assistance Eurostars can supply?
Prior to offering
one. Established up consumers file, and arrange expert sale engineers to introduce business products and providers to consumers in detail.
two. If customers are fascinated in our merchandise, we will send out expert professionals to survey the installation environment.
three. Make the solution according to various customers’ needs.

During offering
1. CZPT installs and examination by qualification engineers.
2. Make certain all the merchandise we offered are competent and new. The functioning lifestyle of the main motor is 15-twenty several years.
three. Construct and put in the heat pump according to countrywide related policies strictly, and make certain large top quality delivery on time.
4. Examination and debug the equipments strictly to make sure the safety and security.
5. Throughout the supply, provide thorough and skilled complex instruction on recommendations and maintenance to customers.

Right after selling
1. We assure to offer you cost-free consulting call in 7×24 hours manner to resolve the troubles found in apply.
2. CZPT guarantee is twelve~18 months from ex-factory date. Inside 18months,if any parts of your products destroyed simply because of top quality, we supply new substitution for cost-free.
3. Soon after the expiration of the high quality assurance, we will proceed to offer lifelong routine maintenance solutions, with just charging some value cost.

8.Consumer check out us

nine.Air cooled water chiller delivery or container loading

10. Installation instruction or set up photo, task pictures

A,Area choice of set up Heat pump
 1). Warmth pump ought to be put in in a large room, and have good air flow condition.
 2). Air inlet and outlet should be a clear highway, the distance from barrier to inlet and outlet should be longer than 2m.
 3). Set drain ditch or drain outlet, so that can drain h2o simply.
 4). The installation foundation or bracket need to be organization, make certain warmth pump work balancely.
 5). Make positive heat pump is vertical, can’t be slanted.
 6). Never install heat pump at the spot in where there is loads of pollutional and corrosive fuel or sand or fallen leaves.
 7). The set up area can’t be near inflammable, flammable factor or fire.
 8). Installation:
—The set up foundation can be concrete building, or metal bracket, and must use anti-vibration rubber pad, And the floor must be easy.
—The style of installation foundation can be in accordance to heat pump bodyweight.
—The heat pump bottom should be fixed by bolt.
B,Pipe relationship
The drain pipe and overflow pipe must be put in around drain ditch or drain outlet, effortless to drain, and install drain h2o valve on drain pipe before magnetic valve there need to be service valve on water pipe.
 If use plastic pipe (this sort of as PPR pipe or Ab muscles pipe), end users need to consider pipe grow and agreement dilemma among warmth pump and water tank.
 Water offer valve and cut-off valve maybe need insulation (according to nearby climate problem),steer clear of frost crack.
C,Water pipe technique installation
Drinking water pipe ought to be straight, and the organize ought to be affordable, minimize bend as tiny as achievable. Minimize the water pipe resistance.
There cannot be leaking at any location of pipe.
Right after all equipments and pipes installation concluded, consumers must test water stress, and drive air out, drain soiled out, make certain water cycle system is  clean. Right after verify there is not any issue, then insulate all hot drinking water pipes.
D,Energy offer wiring
 220V warmth pump use one phase electricity source, 380V heat pump use three period electrical power source, wire line is 3phase 4lines, A B C connects live line, N connects null line, E connect earth. Be confident not to connect N line to live line of electricity supply.
 1).When repairing, you should turn electrical power supply at “off” aspect.
 2).Power provide connecting procedure:make confident a equipment energy provide is reduce off prior to its set up is concluded. Put in power supply swap at appropriate area, Use rubber gap for wiring line in electric powered box.
Power offer need:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
 3).if electrical power provide fluctuation is out of desire, remember to do not start off your heat pump.

 

Air Cooled Scroll Type Water Chiller

English